Hi,
at the last meeting it was proposed to combine the rewording
proposals for IM14 and 15 in one coherent unit. Here is my
suggested wording that achieves that. Replace the paragraph
on p. 50 (in the 1.0 version) just below the prototype for
CycleStamp() with the following text:
The SCE-MI supports a feature called cycle stamping. Each
output message sent to the software side is stamped with the
number of cycles of the 1/1 controlled clock since the
end of creset at the time the message is accepted by the
infrastructure. The cycle stamp shall be 0 while creset is
asserted and 1 at the point of alignment. The cycle stamp
provides [...]
I am not entirely satisfied with the term `end of creset'. Also,
is it unambiguous what `accepted by the infrastructure' means?
Let's discuss,
Per
-- Per Bojsen Email: <bojsen@zaiqtech.com> Zaiq Technologies, Inc. WWW: http://www.zaiqtech.com 78 Dragon Ct. Tel: 781 721 8229 Woburn, MA 01801 Fax: 781 932 7488Received on Wed May 12 18:05:01 2004
This archive was generated by hypermail 2.1.8 : Wed May 12 2004 - 18:05:06 PDT