Hi Kevin, Yes, those changes seem to be okay. I will go ahead and place them in the re-work. Cheers... Dave K. Cameron wrote: > David Miller wrote: >> The updated document the chapter 8 can be found here: >> >> http://www.eda-stds.org/verilog-ams/htmlpages/public-docs/merged_mixedsig.pdf >> > I think the following might be confusing - > > /*8.3.6 Concurrency*/ > /Verilog-AMS provides synchronization between the continuous and > discrete domains./ > /Simulation in the discrete domain proceeds in integer multiples of > the digital tick. This/ > /is the smallest value of the second argument of the `timescale > directive (see Section 19.8/ > /in IEEE 1364-2005 Verilog HDL). Thus, values calculated in the > digital domain shall be/ > /constant between digital ticks and can only change at digital ticks. / > > Drivers in A2Ds are active off-tick, and (should) appear in a > delta-cycle of the real time rounded to the nearest tick - i.e. a tick > spans a period of real time and there can be any number of delta cycles > spread out within it. The actual restriction is that digital simulators > cannot schedule events below the resolution of a tick. E.g. with a > `timescale of 1ps/1ps then the digital simulator can only schedule with > an accuracy of 0.5ps/,/ but it could be activated from an A2D at (say) > 123.07ps, if the simulator then schedules a #1 delay (1ns) the time at > which that occurs would be 124.00ps, a #0 delay event happens at > 123.07ps - and it would appear to be a delta cycle of the tick at > 123.00ps in the digital domain (the tick spans 122.5ps to 123.5ps). > > So I would change the text by striking the last sentence: > > 8.3.6 Concurrency > Verilog-AMS provides synchronization between the continuous and > discrete domains. > Simulation in the discrete domain proceeds in integer multiples of > the digital tick. This > is the smallest value of the second argument of the `timescale > directive (see Section 19.8 > in IEEE 1364-2005 Verilog HDL). Thus, values calculated in the > digital domain shall be > constant between digital ticks and can only change at digital ticks. > > A related old issue is that event scheduling should be rounded to the > nearest tick and not rounded up, so I'd also make the following changes: > > /*8.3.6.1 Analog event appearing in a digital event control* > In this case, an analog event, such as cross or timer, appears in an > @() statement in the > digital context. > / > > /Examples:/ > > /always begin/ > /@(cross(V(x) - 5.5,1))/ > /n = 1;/ > /end/ > > /When it is determined the event has occurred in the analog domain, > the statements under > the event control shall be scheduled in the digital domain at the > largest _nearest_ digital time tick > smaller than or equal to the time of the analog event. This event > shall not be schedule_d_ in > the digital domain earlier than the _last or_ current digital event > (see Section 9.2.3), _however it may appear to be in a delta cycle > belonging to a tick started at an earlier or later time_./ > > /_Zero-delay scheduling is not rounded, so in the case where the > digital event causes the another event on the digital to analog > boundary with zero delay, it will be handled at the current analog > time._/ > > Rounding up or down rather than to the nearest tick introduces more > timing error, e.g. with a 1ps tick the maximum scheduling error is 0.5ps > with nearest while it is 1ps with round-up. The zero-delay scheduling > text is required so that signals just passing through (say) continuous > assignments do not incur unnecessary delays. > > Can you make those changes? > > Regards, > Kev. > -- ===================================== -- David Miller -- Design Technology (Austin) -- Freescale Semiconductor -- Ph : 512 996-7377 Fax: x7755 ===================================== -- This message has been scanned for viruses and dangerous content by MailScanner, and is believed to be clean.Received on Fri Jul 20 15:53:41 2007
This archive was generated by hypermail 2.1.8 : Fri Jul 20 2007 - 15:53:56 PDT