Answers Database
M1.3 Hitop - Fitter fails to meet Period timespec for easy design.
Record #3242
Product Family: Software
Product Line: CPLD Implementation
Problem Title:
M1.3 Hitop - Fitter fails to meet Period timespec for easy design.
Problem Description:
Fitter fails to meet Period timespec for easy design.
Solution 1:
This problem is corrected in the latest CPLD patch available on the
FTP site:
ftp://ftp.xilinx.com/pub/swhelp/M1.3_alliance/epld_nt5.zip
ftp://ftp.xilinx.com/pub/swhelp/M1.3_alliance/epld_hp010898.tar.Z
ftp://ftp.xilinx.com/pub/swhelp/M1.3_alliance/epld_sol010898.tar.Z
ftp://ftp.xilinx.com/pub/swhelp/M1.3_alliance/epld_sun010898.tar.Z
End of Record #3242
For the latest news, design tips, and patch information on the Xilinx design environment, check out the Xilinx Expert Journals! |