Answers Database


PromGen 2.1i: Parallel cable doesn't complete configuration with Virtex chains.


Record #7763

Problem Title:
PromGen 2.1i: Parallel cable doesn't complete configuration with Virtex chains.


Problem Description:
Urgency: Standard

General Description: When configuring a daisy-chain of FPGAs with a Virtex in the first position, down-stream devices do not complete the startup sequence. This is not the case with XChecker which gives extra clocks at the end.


Solution 1:

Manually give extra clocks at the end of the sequence.
This problem is fixed in the latest 2.1i Service Pack available at
http://support.xilinx.com/support/techsup/sw_updates/




End of Record #7763 - Last Modified: 10/15/99 15:55

For the latest news, design tips, and patch information on the Xilinx design environment, check out the Technical Tips!