EDA Industry Council
Project Technical Advisory Board
System Level Design Committee

Requirements Capture Working Group

The Requirements Capture Working Group was working on many of the same problems as DC-WG. The tentative proposal is to fold their work into DC-WG, extending the DC-WG charter to encompass their needs. The information below is background from their effort, which Steve Grout chaired.

Meeting Minutes

7/8 - 7/10/97
Text
4/9 - 4/10/97
RTF, PDF
11/2/96
RTF, PDF
Other Material
Requirement types and attributes/conceptual model
RTF, PDF
Charter and scope information
RTF, PDF
Proposed report to the SLD Committee, 10/25/97
Text