Subject: Meeting Minutes
From: Bailey, Brian (brian_bailey@mentorg.com)
Date: Thu Dec 05 2002 - 15:44:37 PST
Hi Everyone,
Please review the following meetings from our meeting this week. If there are any omissions, changes or additional items that anyone would like to see added, then please send them to me for incorporation.
Thanks
Brian
Accellera ITC Meeting, SCE-MI sub-committee
Dec 3rd 2002
Located at Mentor Graphics
Nish Parikh Synopsys *
Jason Andrews Axis Phone
John Stickley Mentor Graphics Phone
Steve Wang Axis Phone *
Dave Von Bank MacroCAD Phone
Jan Johnson Mentor Graphics *
Duaine Pryor Mentor Graphics
Brian Bailey Mentor Graphics
Joe Daniels Tech Writer
Farid Morsi Aptix *
Dennis Brophy Accellera Chair
Tai Su Cadence *
* Indicates voting member for this meeting
Duaine went over the agenda for the meeting.
Jason + Steve Axis. Have a new donation that they want to make. Time frame - doc within 2 weeks. Currently preparing document. Have worked with a number of vendors on this. This is the first point of contact. Similar to the SCE-MI with additional routines for a cycle based capability. Discussion to find out if this is complementary or would involve significant changes in the base capability. Duaine suggests that this would take a 6 months timeframe to bring the two together. Is this a show stopper or is this a second generation that will add new capabilities in a second generation. It would appear that this analysis has not been done by Axis at this point, but the thought is that this would not be the case.
Issues from previous meeting. John went over the issue that was raised about concurrence of events and ensuring the repeatable ordering of events. John said that this would be the case for any given compile, but not otherwise. Additional documentation should be made available about this. Aptix was happy with this response.
Joe and reformatting - Went over the kinds of changes that he intends to make. Primary difference is moving the tutorial to the back and needs to be separable.
Vote on technical content.
Synopsys Approve
Axis Abstain
Mentor Graphics Approve
Aptix Approve
Cadence Abstain
Approved by majority
** Actions Duaine to forward latest draft doc to everyone for comments and review
** Axis to send in donation to Brian Bailey
** Axis to do a review to see if there is any major road block ASAP
** Next rev of doc from Joe by Jan 7th
** Ratification Meeting on the 21st. Email review until the 17th
Meeting was closed at 10:12
==============================================
Brian Bailey brian_bailey@mentor.com
Chief Technologist Tel: 503 685 1371
System Verification Development Office Fax: 503 685 1652
Mentor Graphics Corp. 8005 S.W. Boeckman Rd. Wilsonville, OR 97070
This archive was generated by hypermail 2b28 : Thu Dec 05 2002 - 15:45:55 PST