Re: Meeting Minutes for Verilog-AMS Committee on August 16


Subject: Re: Meeting Minutes for Verilog-AMS Committee on August 16
From: Steve Grout (grouts@flash.net)
Date: Fri Aug 17 2001 - 15:34:36 PDT


Kevin and Shri -

I would like to work with you on the Backannotation issue.

--Steve Grout - s.grout@ieee.org

-----------
Vassilios.Gerousis@Infineon.com wrote:
>
> Attendees: David Smith (Avanti), Peter (Antrim), Brian M. (Moto), Kevin (NSC), Jon (Cadence), Martin (Cadence), and Vassilios (Infineon)
>
> Priorities: We used Jon suggestion for using 50 (Don't Care) and started on the 5 top most priorities. So Volunteer for each priority were assigned to each topic (and associated topics).
>
> Team Solutions
> Each team will develop / refine the proposal and submit that for discussions for everyone on the committee. The first name in each team is the leader responsible for calling meeting or conference call with his team members and provide a joint agreed proposal. The proposal must include justification. Once it is ready, it should be circulated to the committee and discussed through emails.
>
> Here are the topics are priorities
>
> 1-Priority One (Real Data Port):
> Assignment :"Jon Sanders" and David Smith.
> This priority is combined with Number four. The team will examine
> other related issues and provide proposal.
>
> 2- Backannotation:
> Assignment : "Kevin" and Shri.
>
> 3- Discipline:
> Assignment: "Peter", Shri and Jon.
>
> 4- Real Net declaration: Assigned with Priority One.
>
> 5- Concurrency :
> Assignment: "Martin" and David. Should collect all
> synchronization Issues and provide a proposal.
>
> Duration:
>
> All teams will use the next two weeks to develop and enhance the proposal.
> The team must agree on the proposal (convince and compromise). If the proposal
> is ready before two weeks, then send it to the committee to review and give feedback.
> In this duration we will not have a committee meeting.
>
> By the end of the two weeks (August 30), I hope that everyone will have a complete proposal and sent to the entire committee. The committee will examine each proposal for a week and then we will have a meeting.
>
> Our next committee meeting will be on September 6.
>
> THANKS
>
> I want to thank everyone for the positive participation. We had a good meeting and let us continue the positive work.
>
> NEXT COMMITTEE MEETING: September 6.
>
> Enclosure: You will find the Excel Sheet. On Sheet TWO, you will see the 5 most top items. I have added the assignment team to each priority.
>
> Best Regards
>
> Vassilios
>
> ------------------------------------------------------------------------------------------------------------------------------
> Dr. Vassilios Gerousis Infineon Technologies
> DAT CAD, MchB
> Telephone: +49-89-234-21342 BalanSt. 73
> Fax: +49-89-234-23650 D-81541 Munich
> email: Vassilios.Gerousis@infineon.com Germany
> Site Map: http://www.stadtplandienst.de/query;ORT=m;PLZ=81541;STR=Balanstr%2E;HNR=73
> ----------------------------------------------------------------------------------------------------------------------------------
>
> <<Average-AMSLRM_ISSUES_adj.xls>>
>
> -------------------------------------------------------------------------------------
> Name: Average-AMSLRM_ISSUES_adj.xls
> Average-AMSLRM_ISSUES_adj.xls Type: Microsoft Excel Worksheet (application/vnd.ms-excel)
> Encoding: base64

-- 
--Steve Grout
  CAD Methodologist, Architect, Manager, Individual Contributor -
  CAD System, Database, Flows, Tools, Integration, and Support
  for both digital and Analog/Mixed-Signal.
  101 Kenneil Court
  Apex, NC 27502
  Phone: 919-303-5066
  email: grouts@flash.net
  http://www.flash.net/~sgrout/Personal/resume2001.txt (or doc,rtf,pdf)



This archive was generated by hypermail 2b28 : Fri Aug 17 2001 - 15:36:10 PDT