The third edition of the LRM draft is now available for review, and can be accessed at: http://www.eda.org/ieee-1850/docs/IEEE-1850-PSL-DRAFT-Mar-8.pdf This version uses the same password as the previous version. What's new? - Scope and Purpose updated to match PAR - New Annex C added for references - Latest Annex B formal semantics - Corrections on previous version based on feedback - Formating corrections in multiple places Known problems in third edition of draft: - Still need to add in SystemC info when we get answer's from the SystemC group - Extra pages 13-14 should be removed - Extra pages 47-48 should be removed - Box 79 (page 92), need to fix font style for "bit" in PSL_Boolean_Type - Annex B, Need to remove references (references were moved to Annex C) - Annex B, Need to change "Appendix A" references in text to "Annex B" in section B.1. - Annex B, page 128, need to change reference [2] to [B4]. - Annex B, page 130, need to change reference [1] to [B3], and [3] to [B5] - Annex B, page size still has problem. It doesn't appear to be 8.5x11 (view in Acrobat Reader at 50% and see size difference between pages) - Annex B, width of page is too large, doesn't match automatically generated headers/footers. Need to adjust page size (8.5"x11") first before adjusting width (1.25"). -HarryReceived on Sun Mar 6 13:33:24 2005
This archive was generated by hypermail 2.1.8 : Sun Mar 06 2005 - 13:33:36 PST