According to Shalom, all 1364 items which were approved by
the VSG have been incorporated into the latest draft already.
I am not aware of any items passed by the PTF that were
not also passed by the VSG. Am I missing some?
-Chas
Jim Vellenga wrote:
> If a proposal for 1364 was already approved by the
> previous 1364 body, does it have to get reentered
> as a V-PTF item?
>
> What about those which were approved by the PTF but
> not yet by the parent 1364 body?
>
> Regards,
> Jim V.
>
> ---------------------------------------------------------
> James H. Vellenga 978-262-6381
> Engineering Director (FAX) 978-262-6636
> Cadence Design Systems, Inc. vellenga@cadence.com
> 270 Billerica Rd
> Chelmsford, MA 01824-4179
> "We all work with partial information."
> ----------------------------------------------------------
>
>
>
> ] -----Original Message-----
> ] From: owner-sv-cc@eda.org [mailto:owner-sv-cc@eda.org] On
> ] Behalf Of Charlie Dawson
> ] Sent: Tuesday, November 16, 2004 9:55 AM
> ] To: SV-CC
> ] Subject: [sv-cc] PTF items and a proposal for PTF 342.
> ]
> ] Hi All,
> ]
> ] It looked for a while there that our proposal to create new
> ] Mantis Issues for
> ] the PTF items which we wanted to work on had been nixed.
> ] Last week Karen
> ] and John decided they liked the idea after all. So, we now have a new
> ] category called V-PTF. I have added the first item there: 303 which
> ] corresponds to PTF 342.
> ]
> ] Here is what I would like people to do. If you want to make
> ] a proposal for
> ] a PTF item, add it in this category, and include in the title
> ] the original
> ] PTF item number and title. Then in the description add a
> ] link to the old
> ] data base.
> ]
> ] Item 303 has been setup this way, and can be used as an example.
> ]
> ] Finally, I have added a new proposal for 303 which
> ] incorporates all of the
> ] feedback from PTF 342's last proposal and I have done another
> ] pass over
> ] the LRM looking for additional changes that would be
> ] necessary as a result
> ] of this change.
> ]
> ] I then put all of this into the approved format. I think we
> ] have a complete
> ] and thorough proposal at this point.
> ]
> ] -Chas
> ]
> ] --
> ] Charles Dawson
> ] Senior Engineering Manager
> ] NC-Verilog Team
> ] Cadence Design Systems, Inc.
> ] 270 Billerica Road
> ] Chelmsford, MA 01824
> ] (978) 262 - 6273
> ] chas@cadence.com
> ]
> ]
> ]
> ]
>
-- Charles Dawson Senior Engineering Manager NC-Verilog Team Cadence Design Systems, Inc. 270 Billerica Road Chelmsford, MA 01824 (978) 262 - 6273 chas@cadence.comReceived on Tue Nov 16 08:54:02 2004
This archive was generated by hypermail 2.1.8 : Tue Nov 16 2004 - 08:54:05 PST